Weather Window Open. Crew Is Ready. Let's Pour.
Concrete tracks your pour schedule, monitors weather forecasts for optimal cure conditions, and makes sure your mix designs and batch records are always job-ready.
Concrete doesn't care about your schedule — it cures on its own timeline and the weather decides when you work. Concrete puts a weather monitor on every job so you can plan pours around conditions, not around guesses. AI generates takeoffs from plan sets, calculating square footage, thickness, and material quantities so your estimator isn't doing the same math over and over. Batch records, mix designs, and compression test results are stored with the job so you're ready for any inspection or owner request.
Built for Concrete
AI Takeoffs
Upload plans and get square footage, cubic yards, and a material list in minutes. Accurate estimates, less time at the desk.
Pour Schedule & Weather
Track every pour date with a live weather overlay. Know days in advance if conditions are going to push your timeline.
Batch & QC Records
Mix designs, batch tickets, and compression test results tied to every pour. Always ready for inspection.
From first bid to final draw
Here's an example of what a concrete job looks like moving through Greenfield, start to finish.
- Step 1 · New LeadNew
Riverside Commercial — 6,000 sq ft Flatwork
Referral from GC · logged this morning
Customer: Riverside Development LLCScope: Slab-on-grade, 6,000 sq ft, 5" thicknessSource: GC referral - Step 2 · EstimateGenerated
AI Takeoff From Plan Set Complete
Cubic yards + rebar schedule calculated automatically
Concrete: 94 cu yd, 4000 PSIRebar: #4 @ 18" O.C. both waysEstimate total: $47,500 - Step 3 · ProposalSent
Proposal Sent to GC
Delivered by email · e-signature link included
Sent to: pm@riversidedev.examplePayment terms: 30% deposit / progress draws - Step 4 · ContractSigned
Contract Signed & Deposit Collected
E-signed same day · job created automatically
Deposit: $14,250 collectedStatus: Job created automatically - Step 5 · MaterialsOrdered
Ready-Mix & Rebar Ordered
Auto-generated purchase order from job specs
Supplier: Metro Ready-Mix ConcretePour date lock-in: Confirmed pending weather - Step 6 · SchedulingScheduled
Pour Date Set — Weather Window Confirmed
Weather monitor cleared the forecast window
Pour date: Thu, 7amForecast: Clear, 68°F — ideal cure conditions - Step 7 · ProductionIn Progress
Pour Underway — Batch Tickets Logged
Crew logging batch tickets & compression cylinders from the field
Progress: 6,000 of 6,000 sq ft pouredQC: 3 test cylinders pulled - Step 8 · InvoiceSent
Final Draw Invoice Sent
Auto-generated on job completion, remaining balance only
Balance due: $33,250Payment link: Included - Step 9 · PaidPaid
Final Draw Received — Job Closed
Paid within terms after 7-day cure inspection passed
Total collected: $47,500Status: Job archived
Illustrative example for demonstration purposes — not a real customer or job.
Ready to run a tighter operation?
Join contractors already using Greenfield Operations to manage every job from first contact to final payment.
Pour Smarter, Not Harder